Insights, page 4 of 4

Written answers to the questions buyers actually type. Each one opens with a summary that stands on its own, and is dated so you know how current it is.

Page 4 of 4. Articles 73 to 80 of 80.

Published

Do you need a marketing data warehouse, or just a dashboard?

The honest answer is that most mid-market marketers do not need one yet. Here is how to tell whether you do.

A dashboard is sufficient when reporting reads from one platform and history beyond that platform's retention does not matter. A marketing data warehouse earns its cost under four conditions: cross-platform questions, retention beyond platform limits, per-location rollups, and numbers that must be reproducible and auditable. For most mid-market marketing datasets, running costs are tens of dollars a month; connector licensing is usually the larger line.

Read the article: Do you need a marketing data warehouse, or just a dashboard?
Published

Why you cannot measure cost per acquisition by location

The conversions are real. The ability to credit them to a location is what is missing.

In multi-location businesses, conversion events frequently fire without a location parameter. The conversions are real and correctly counted in aggregate, but per-location performance becomes unmeasurable, which means budget decisions across sites get made on aggregate data and instinct. This is an attribution gap, it is fixable at the event layer, and it should be closed before any optimisation work begins.

Read the article: Why you cannot measure cost per acquisition by location
Published

Story points or hour bands: estimating agency work

They answer different questions. Most estimation arguments are really about which question is being asked.

Story points measure relative size and become a schedule only when multiplied by measured velocity. Hour bands communicate cost and commitment to a client. Agencies need both: points for internal sequencing, bands with written assumptions for the commercial conversation. Most estimation disputes are two people answering different questions with the same number.

Read the article: Story points or hour bands: estimating agency work
Published

What a Tableau Server to Cloud migration actually costs

The conversion work is the easy part. Nobody believes that until the deadline arrives.

A mid-size Tableau Server to Tableau Cloud migration, on the order of 150 data sources and 100-plus workbooks, takes three to six months end to end. The variable is rarely conversion effort; it is inventory, stakeholder validation and access provisioning. Programs that skip the inventory phase estimate against a number nobody has verified, and the variance is routinely a factor of two.

Read the article: What a Tableau Server to Cloud migration actually costs
Published

What a Google Ads MCC is, and when you actually need one

It is an administrative layer, not an advertising account. Confusing the two is where the operational failures start.

A Google Ads manager account (Google's term is My Client Center, or MCC) is a container that administers multiple Google Ads accounts under one login, with consolidated billing, cross-account reporting and shared assets. No campaigns run in it directly. It becomes worth the setup at roughly five accounts, and becomes essential wherever separate locations carry separate budgets or separate accountability.

Read the article: What a Google Ads MCC is, and when you actually need one
Published

Why your Google Ads and GA4 conversion numbers don't match

Some of the gap is by design. The rest is a defect, and the two need separating before anyone makes a budget decision.

Google Ads and GA4 report different conversion counts because they use different attribution models, different attribution dates, and different session definitions. A stable gap of roughly five to fifteen percent is normal. A large, unstable, or directionally odd gap usually indicates duplicate event firing, broken cross-domain measurement, or an unverified conversion action.

Read the article: Why your Google Ads and GA4 conversion numbers don't match
Published

How to scope a fixed-fee SOW that doesn't lose money

The margin on a fixed-fee project is decided before anyone writes code.

A fixed-fee statement of work protects margin through four mechanisms: an estimate built from decomposed work rather than a buffered guess, a written assumptions list, an explicit exclusions list, and acceptance criteria that make "done" testable. Projects that lose money almost always failed at one of those four in the document, not during delivery.

Read the article: How to scope a fixed-fee SOW that doesn't lose money
Published

What a fractional technical project manager actually does (2026)

The role is widely advertised and inconsistently defined. Here is the version that describes a job rather than a title.

A fractional technical project manager owns delivery for an organization part-time, typically two to four days a week, covering estimation, sequencing, scope and change control, QA, and client-facing communication for technical work. The role differs from a full-time PM in availability and cost structure, and from a consultant in that a fractional PM has operational responsibility for shipping, not just recommendations.

Read the article: What a fractional technical project manager actually does (2026)